| Year | System name | Seating |
| 2008 | Operating system for water cleaning | “Energetica” power and heating plant, JSC «Group “ILIM” |
| 2008 | Operating system for coagulated water pumps | JSC “Perm GRES” |
| 2008 | Operating system for sewage sewer pumps | JSC “Perm GRES” |
| 2007 | Process and equipment control system for chemical waterpreparing of the pumps | "Sayano-Shusenskaya" HPP |
| 2007 | Process and equipment control system for chemical waterpreparing station on the base of PTC “Apogey” | JSC "Ammophos" power and heating plant |
| 2007 | Operating and monitoring system for transformation equipment | Mosenergo power and heating plant-8 |
| 2007 | Operating and monitoring system for 2 transformers of type TDC-400000/500 | HPP “Burejskaya” |
| 2007 | Allocation system of the outdoor illumination power supply | "Hydro power plant "Shikapa" |
| 2007 | Developing, producing and verification of the PTC for the oil-forcing unit (OFU) | "Mainskaya" HPP |
| 2007 | Operating control station for water-preparing house | JSC " Kotlas pulp and paper mill" |
| 2007 | Hardwarily-software complex of the emergency power supply system of the power unit ¹2 | Leningrad APP |
| 2007 | Developing, producing and verification of the PTC oil-forcing unit | "Mainskaya" HPP |
| 2007 | Developing, producing and supply of the power cases of the auxiliary systems for turbogenerator TVV-660-2T3 units 1..3 | “Sipat” heating and power plant |
| 2007 | Process and equipment control system for chimiwaterclearing on the base of PTC “Apogey” | JSC “NTMK” |
| 2007 | Control and operating system for the main ventilation unit | Yakovlevsk mine LLC “Metal-group” |
| 2007 | Process and equipment control system for boiler equipment | Primorskaya SUE "TEC SP" |
| 2007 | Process and equipment control system for heat plant | Primorskaya SUE "TEC SP" |
| 2006 | Process and equipment control system for turbocompressor TK5500/22 TK-10 PVS-2 | Heating and power plant JSC “NTMK” |
| 2006 | Technological protection, signaling and locking systems for boiler units st.¹12,13 and 14 | JSC "Arkhangelsk pulp and paper mill" |
| 2006 | Implementing of the “breakdown” signal from the gas analyzers in the operating and control system of the boiler | “Dvigatelplant” boiler plant ¹1 |
| 2006 | Automatic control systems of mine pumps HPP-11 | The cascade of HPP Vuoksa |
| 2006 | Producing and supply of the electrotechnical and auxiliary equipment | HPP "Balimela" |
| 2004 | Control system for pump plant of mixture | Heating and power plant ¹5 |
| 2004 | Process and equipment control system for a chimiwaterclearing | JSC "Arkhangelsk pulp and paper mill" |
| 2004 | Control system for deaerators installation | FGUAP "Pulkovo" |
| 2003 | Control system for common equipment of turbine house ¹2 | JSC "Ammophos" power and heating plant |
| 2003 | Monitoring and emergency trend record system for emergency power supply of power-generating unit ¹2 | Kola NPP |
| 2003 | Control system for auxiliary equipment of hydroelectric power station | Zeiskaya hydroelectric power plant |
| 2003 | Monitoring and emergency trend record system for emergency power supply of power-generating unit ¹1 | Kola NPP |
| 2001 | Residual oil handling facilities control system for thermal power plant-1 | JSC "Arkhangelsk pulp and paper mill", heating and power station-1" |
| 2000 | Control system for deaerators ¹¹1,2,3 power and heating plant-3 | JSC "Svetogorsk" |