|
Index Page / Press Center / News Press CenterNew automation for modernized turbine13.01.2012 Modernized Ò-110/120-130 turbine manufactured by Ural Turbine Works CJSC, equipped with a modern regulation and protection system, has been successfully put into operation. Ò-110/120-130 turbine, Novosibirsk HPP-4 station No. 8 (Siberian Energetic Company, OJSC) has been renovated with the purpose of the recourse extension as well as improving of technical, economic and operational rates. A new level of Zagorskaya PSHPP hydro units control12.01.2012 Control system for Zagorskaya PSHPP hydro unit No. 3 has been put into operation by the beginning of 2012. Control system start-up has completed a complex of works on modernization of... New Year 2012 congratulations!30.12.2011 Rakurs Group sincerely wishes you a Merry Christmas and a Happy New 2012 Year! Automated control system for turbo unit of Arkhangelskiy PPM thermal power plant-127.12.2011 SPC Rakurs Ltd. has successfully completed start-up and adjustment at Arkhangelskiy PPM within the bounds of project – automated control system for thermal power plant-1 turbo unit No. 3, Arkhangelskiy PPM OJSC. Rakurs-engineering is taking part in IX Forum of St. Petersburg Small Business14.12.2011 On December 14-15 Forum of St. Petersburg Small Business is being held in Lenexpo exhibition complex. Twelve St. Petersburg districts, the Committee for Economic Development, Industrial Policy and Trade, Public Council for small business development under St. Petersburg Governor and other City Administration and small business representatives have placed their stands in 7th exhibition hall. SPC Rakurs is “The best 100 products of Russia” competition Laureate01.12.2011 On November 29 a solemn ceremony of prize-giving to “The best 100 products of Russia” competition Laureates took place in Test-St. Petersburg”. SPC Rakurs has been awarded with an honoured winner status again. Hardware and software complex “Electro Hydraulic Regulator of frequency and active power for hydraulic turbines (PTC HER) on the base of PTC Apogey” has been presented at the competition. Maintenance and supply of equipment for Solikamskaya thermal power plant automated control system28.11.2011 Under the contract of post-warranty service and check-up of control system and software equipment manufactured by SPC Rakurs for two turbo units of Solikamskaya TPP the works of check up as well as supply of new equipment for automated control system SCADA level have been performed. Complete electric drive for pump unit23.11.2011 Specialists of SPC Rakurs electro drive Department have designed and manufactured complete pump units control system under request of Energoprom CJSC, St. Petersburg, for TOO NOVA-Cink, city of Akzhal, Kazakhstan. Check up of boiler units automated systems21.11.2011 On 16 November, 2011 SPC “Rakurs” specialists checked the upper level safety automation for three boiler units ÄÊÂÐ-10/13 of boiler house No. 1, plant “Dvigatel”. One year has passed since the beginning of “Rakurs-engineering” building in SEZ “St. Petersburg”18.11.2011 Exactly one year ago on 18 November “Rakurs-engineering” scientific and technical centre has been started at the site Neudorf of SEZ “St. Petersburg” – a solemn ceremony of capsule laying in the... |
|
© 1991 - 2010 SPC "Rakurs" |
|
|
198095 Russia, Saint-Petersburg, Khimichesky pereulok, 1/2
Tel.: 8 (812) 252 32 44, 8 (812) 252 43 90 Ôàêñ: 8 (812) 252 59 70 Full contacts |
|