| Year |
Project |
Object |
Sector |
| 2010-201 |
Control System for power generating unit No.4 (210 MW) |
Gusinoozersk SDPP, WGC-3 JSC |
Multipurpose projects
|
| 2010 |
Equipment package with instulled software for modernization of papermachine No.10 |
Kommunar paper mill, JSC |
Pulp and paper industry
|
| 2010 |
Design and implementation of production-planing system for Svetogorsk Mill |
CJSC International Paper, Svetogorsk Mill |
Pulp and paper industry
|
| 2010 |
Equipment for parameters and state monitoring and registration system of emergency power supply scheme of unit No.4 auxiliaries |
Leningrad NPP |
Nuclear power industry
|
| 2010 |
Control System for hydroelectric unit ¹1 (120 MW) |
Kambaratinskaya HPP-2 |
Hydropower engineering
|
| 2010 |
Control System for power-generating unit (83 MW), relay protection and automatic equipment, Group governor of active and reactive power |
Ust-Kamenogorsk HPP |
Hydropower engineering
|
| 2010 |
Reconstraction of Hydro Power Plant Control System (units No.4,5,6) |
Sayano-Shushenskaya HPP, RusHydro JSC |
Hydropower engineering
|
| 2010 |
Monitoring and Control System for boiler unit No.6 and reconsruction of gas feeding path |
Power Plant of the Koryazhma Branch of Ilim Group (Kotlas PPM) |
Heat-power engineering
|
| 2010 |
Monitoring and Control System for boiler unit No.10 |
Power Plant, JSC Ammophos |
Heat-power engineering
|
| 2010 |
Control System for power-generating unit No.6 (63 MW) inc. boiler, turbine, generator, electrical annex |
Power Station of the Sokolovo-Sarbayskoe ore-dressing and processing enterprise |
Multipurpose projects
|
| 2010 |
Monitoring and Control System for power-generating unit No.6 (63 MW) inc. boiler, turbine, generator and electrical annex |
Power Station of the Sokolovo-Sarbayskoe ore-dressing and processing enterprise |
Heat-power engineering
|
| 2009-2016 |
Modernization of the relay protection and automatic equipment |
Zagorskaya PSHPP, RusHydro JSC |
Hydropower engineering
|
| 2009 |
Distribution cabinets |
Dzherdap-1 HPP |
Hydropower engineering
|
| 2009 |
Distribution cabinets |
Lesogorskaya HPP, Cascade of Vuoksiskie HPPs, TGC-1 JSC |
Hydropower engineering
|
| 2009 |
Distribution cabinets |
Svetogorskaya HPP, Cascade of Vuoksiskie HPPs, TGC-1 JSC |
Hydropower engineering
|
| 2009 |
Manufacturing Execution System for Power Plant (design of project) |
South-West Power Plant |
Heat-power engineering
|
| 2009 |
Control system for power generating unit ¹6 (63 MW) inc: boiler unit Å280-9,8-510ÊÒ, turbine unit Ê-63-8,8, generator ÒÔ-63-2ÓÇ, electrical annex |
Power Station of the Sokolovo-Sarbayskoe ore-dressing and processing enterprise |
Metallurgy industry
|
| 2009 |
Technological Control System for turbogenerator ÒÂÂ-500-4Ó3 unit ¹ 5 |
Novovoronezh NPP |
Nuclear power industry
|
| 2009 |
Technological Control System for turbogenerator ¹2 ÒÂÂ-500-2ÓÇ, unit ¹ 1 |
Leningrad NPP |
Nuclear power industry
|
| 2009 |
Control System for stator end winding vibration of turbogenerator ÒÂÂ-1000-4Ó3, units ¹ 1,2 |
Volgodonsk NPP |
Nuclear power industry
|
| 2009 |
Control System for stator end winding vibration of turbogenerator ÒÂÂ-1000-4Ó3, units ¹ 1, 2, 3 |
Balakovo NPP |
Nuclear power industry
|
| 2009 |
Control System for stator end winding vibration of turbogenerator ÒÂÂ-1000-4Ó3, units ¹ 1-2 |
Kalinin NPP |
Nuclear power industry
|
| 2009 |
Control System for Hydro Power Plant (34 MW) |
Golovnaya HPP (Zaramagskiye HPPs), RusHydro JSC |
Hydropower engineering
|
| 2009 |
Control System for hydroelectric units ¹1-2 (22,5 MW) |
Gissarakskaya HPP |
Hydropower engineering
|
| 2009 |
Control System for hydroelectric unit ¹1 (27,5 MW) and SCADA level |
Nijnesvirskaya HPP-9, TGC-1 JSC |
Hydropower engineering
|
| 2009 |
Control System for hydroelectric unit ¹1 (12 MW) and SCADA level |
Volkhovskaya HPP-6, TGC-1 JSC |
Hydropower engineering
|
| 2009 |
Control System for Hydro Power Plant (project design ) |
Boguchanskaya HPP |
Hydropower engineering
|
| 2009 |
Monitoring and Control System for boiler units No.1,2,3 |
Power Plant Parnas-4, SUE "TEK SPb" |
Heat-power engineering
|
| 2009 |
Control System for Hydro Power Plant (hydroelectric unit No.1 and SCADA level) |
Volkhovskaya HPP-6, TGC-1 JSC |
Multipurpose projects
|
| 2009 |
Control System for Hydro Power Plant (hydroelectric unit No.1 and SCADA level) |
Nijnesvirskaya HPP-9, TGC-1 JSC |
Multipurpose projects
|
| 2008-2016 |
Modernization of the relay protection and automatic equipment |
Zagorskaya PSHPP, RusHydro JSC |
Multipurpose projects
|
| 2008-2015 |
Modernization of the Control System for electrotechnical equipment |
Zagorskaya PSHPP, RusHydro JSC |
Hydropower engineering
|
| 2008-2015 |
Modernization of the Control System for electrotechnical equipment |
Zagorskaya PSHPP, RusHydro JSC |
Multipurpose projects
|
| 2008-2010 |
Control System for Hydro Power Plant (2 hydroelectric units x 22,5 MW) |
Gissarakskaya HPP |
Multipurpose projects
|
| 2008-2010 |
Control System for Hydro Power Plant |
Golovnaya HPP (Zaramagskiye HPPs), RusHydro JSC |
Multipurpose projects
|
| 2008 |
Generator synchronization cabinets for two hydrogenerators |
Tupolangskaya HPP |
Hydropower engineering
|
| 2008 |
Control system for production line of automated receiving and passing of raw materials |
Petroproduct Otradnoye, Heinz Corporation |
Other industries
|
| 2008 |
Control System for potable water supply pumps |
Sayano-Shushenskaya HPP, RusHydro JSC |
Heat-power engineering
|
| 2008 |
Automated operative-dispatch control system (MES-system) for Pulp-and-Paper Mill (design of technical specification) |
Solombala PPM, OJSC |
Nuclear power industry
|
| 2008 |
Control System for sand drying line |
Kvarts JSC |
Concrete and cement production
|
| 2008 |
Control System for concrete mixing unit |
Production Association "Barrikada" |
Concrete and cement production
|
| 2008 |
Control System for reinforced concrete unit |
PermTransZhelezobeton |
Concrete and cement production
|
| 2008 |
Control System for concrete mixing unit |
Zhelezobeton Ltd |
Concrete and cement production
|
| 2008 |
Control System for concrete mixing unit |
Caucasian Concrete Sleeper Plant |
Concrete and cement production
|
| 2008 |
Control System for dry building mixture unit |
Plant in Voronezh |
Concrete and cement production
|
| 2008 |
Technological Control System for turbogenerator ¹1 ÒÂÂ-500-2ÓÇ, unit ¹ 1 |
Leningrad NPP |
Nuclear power industry
|
| 2008 |
Control System for hydroelectric units ¹1-¹3 (22 MW) |
Cascade of Nizhne-Cherekskie HPPs, Kashkhatau HPP, RusHydro JSC |
Hydropower engineering
|
| 2008 |
Hardware and software of frequency and active power regulating system for hydraulic turbines and oil pressure installations of hydroelectric units No.1-No.4 |
Golovnaya HPP (Zaramagskiye HPPs), RusHydro JSC |
Hydropower engineering
|
| 2008 |
Unit level of Control System for hydroelectric units No.1-No.4 (4 x 167,5 MW) |
Sangtudinskaya HPP-1 |
Hydropower engineering
|
| 2008 |
Monitoring and Control System for boiler unit No. 7 |
Power Plant, JSC Ammophos |
Heat-power engineering
|
| 2008 |
Monitoring and Control System for boiler unit |
Vasileostrovskaya Power Plant-7 JSC TGC-1 |
Heat-power engineering
|
| 2008 |
Monitoring and Control System for boiler unit No. 8 |
Power Plant of the Koryazhma Branch of Ilim Group (Kotlas PPM) |
Heat-power engineering
|
| 2007-2011 |
Control System for Pumped-Storage Hydro Power Plant (6 hydroelectric units x 200 MW, SCADA level) |
Zagorskaya PSHPP, RusHydro JSC |
Multipurpose projects
|
| 2007-2011 |
Control System for Hydro Power Plant (4 hydroelectric units x 670 MW, inc.SHC for electrohydraulic governor, SHC for oil-pressure installation) |
Satgtudinskaya HPP-1 |
Multipurpose projects
|
| 2007 |
Technological Control Systems for hydrogenerators unit ¹1 and ¹2 type ÂÃÑ-525/84-32 |
Mezhshluzovaya HPP |
Hydropower engineering
|
| 2007 |
Monitoring and Control System for two transformers |
Bureyskaya HPP, RusHydro JSC |
Hydropower engineering
|
| 2007 |
Technological Control System for hydrogenerator, unit ¹10 |
Krasnoyarsk HPP |
Hydropower engineering
|
| 2007 |
Distribution system for power supply outdoor lighting |
Shikapa HPP |
Hydropower engineering
|
| 2007 |
Control System for hydroelectric units ¹1-¹4 (5,44 MW) |
Shikapa HPP |
Hydropower engineering
|
| 2007 |
Control and distribution cabinets for control system of chemical water treatment |
Power Plant of the Koryazhma Branch of Ilim Group (Kotlas PPM) |
Pulp and paper industry
|
| 2007 |
Automated operative-dispatch control system (MES-system) for wood chips production process (design of technical specification) |
Ust-Ilimsk Branch of Ilim Group (Ust-Ilimsk Pulp Mill) |
Pulp and paper industry
|
| 2007 |
Automated operative-dispatch control system (MES-system) for wood chips production process (design of technical specification) |
Ust-Ilimsk Branch of Ilim Group (Ust-Ilimsk Pulp Mill) |
Pulp and paper industry
|
| 2007 |
Automated operative-dispatch control system (MES-system) for cellulose production process (design project) |
Ust-Ilimsk Branch of Ilim Group (Ust-Ilimsk Pulp Mill) |
Pulp and paper industry
|
| 2007 |
Control System for modular plant of concrete manufacturing |
Perm Plant |
Concrete and cement production
|
| 2007 |
Control System for concrete mixing unit |
Krasnokamensky Plant of concrate goods |
Concrete and cement production
|
| 2007 |
Control System for concrete mixing unit |
"GBK-7" (reinforced concrete construction plant) |
Concrete and cement production
|
| 2007 |
Control System for concrete mixing unit |
"GBK-7" (reinforced concrete construction plant) |
Concrete and cement production
|
| 2007 |
Control System for two concrete mixing units and four moist and termal curing chambers |
Chudovo Concrete Sleeper Plant |
Concrete and cement production
|
| 2007 |
Control System cabinets for chemical water treatment process of Power Plant No.1 |
Power Plant of the Koryazhma Branch of Ilim Group (Kotlas PPM) |
Pulp and paper industry
|
| 2007 |
Automated operative-dispatch control system for cellulose production process (design project) |
Ust-Ilimsk Branch of Ilim Group (Ust-Ilimsk Pulp Mill) |
Pulp and paper industry
|
| 2007 |
Control system for by-product coke plant turbogenerator Ð-12 |
Nizhniy Tagil Iron and Steel Works, JSC NTMK |
Metallurgy industry
|
| 2007 |
Control system for main ventilation installation of Yakovlevsky mine |
Metal Group Ltd. |
Metallurgy industry
|
| 2007 |
Technological Control System for turbogenerator ÒÂÂ-500-4Ó3 |
Novovoronezh NPP |
Nuclear power industry
|
| 2007 |
Technological Control Systems for turbogenerators ¹1-2 (ÒÂÂ-1000-4Ó3) |
Kalinin NPP |
Nuclear power industry
|
| 2007 |
Hardware and software complex of emergency power supply system, unit ¹2 |
Leningrad NPP |
Nuclear power industry
|
| 2007 |
Monitoring and Control System for hot-water boilers No.2,3,4 |
Petrozavodsk Branch, JSC PKS "Teploviye Sety" - Heat Supply Network |
Heat-power engineering
|
| 2007 |
Control System for Power Station Gas-Turbine Unit (2 GTUs, outdoor switchgear, auxiliary equipment, integration of present subsystems) |
Belgorodskaya Power Station, TGC-4 JSC |
Multipurpose projects
|
| 2007 |
Control System for Hydro Power Plant (3 hydroelectric units x 22 MW) |
Kashhatau HPP, Cascade of Nijne-Chereksky HPPs |
Multipurpose projects
|
| 2007 |
Control System for Hydro Power Plant (4 hydroelectric units x 5,44 MW, SCADA level) |
Shikapa HPP |
Multipurpose projects
|
| 2006-2009 |
Control System for hydroelectric units ¹1-¹7 (7 x 640 MW) |
Sayano-Shushenskaya HPP, RusHydro JSC |
Hydropower engineering
|
| 2006-2009 |
Control System for Hydro Power Plant (10 hydroelectric units x 640 MW, inc. SHC for electrohydraulic governor, SHC for oil-pressure installation,outdoor switchgear 500,telemechanics systems) |
Sayano-Shushenskaya HPP, RusHydro JSC |
Multipurpose projects
|
| 2006-2008 |
Control System for Hydro Power Plant (3 hydroelectric units x 200 MW, inc.SHC for electrohydraulic governor, SHC for oil-pressure installation, outdoor switchgear 220 ) |
Mainskaya HPP, RusHydro JSC |
Multipurpose projects
|
| 2006 |
Technological Control System for hydrogenerator, unit ¹3 |
Kapanda HPP |
Hydropower engineering
|
| 2006 |
Electrical and auxiliary equipment for hydro power plant |
Balimela HPP |
Hydropower engineering
|
| 2006 |
Control System for hydroelectric units ¹1-¹3 (3 x 131 MW) |
Mainskaya HPP, RusHydro JSC |
Hydropower engineering
|
| 2006 |
Power cabinets, distribution cabinets and control cabinets for plant equipment |
Shikapa HPP |
Hydropower engineering
|
| 2006 |
Control System for organic waste receiving and recycling (block 102/104) |
Landfill "Krasny Bor" |
Other industries
|
| 2006 |
Protection system for tobacco extract concentration complex |
JTI Yelets, CJSC |
Other industries
|
| 2006 |
Automated control system for container washing line |
Siberian Chemical Combine, FSUE |
Other industries
|
| 2006 |
Automated operative-dispatch control system (MES-system) for cardboard and paper production |
Power Plant of the Koryazhma Branch of Ilim Group (Kotlas PPM) |
Heat-power engineering
|
| 2006 |
Control System for concrete mixing and adressed dispensing shops |
Perm selicate panels plant (PZSP JSC) |
Concrete and cement production
|
| 2006 |
Conrtol System for technological process parameters of concrate mixing and molding shops |
Novolipetsk Steel (JSC NLMK) |
Concrete and cement production
|
| 2006 |
Modernization of Control System for fiberboard production |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2006 |
Automated operative-dispatch control system for cardboard and paper production processes |
Power Plant of the Koryazhma Branch of Ilim Group (Kotlas PPM) |
Pulp and paper industry
|
| 2006 |
Control System for compressor, unit ¹2 |
Metallurgical Plant Petrostal CJSC |
Metallurgy industry
|
| 2006 |
Hardware and software complex for blast furnace automatic regulation and control |
Donetsk steel CJSC |
Metallurgy industry
|
| 2006 |
Control System for technological parameters of concrete-mixing and moulding units |
Novolipetsk Steel (JSC NLMK) |
Metallurgy industry
|
| 2006 |
Control System for oxygen compressor ÊÒÊ-12,5/35, unit ¹6 |
Novolipetsk Steel (JSC NLMK) |
Metallurgy industry
|
| 2006 |
Monitoring and Control System for boiler unit No.5 |
Power Plant of the Koryazhma Branch of Ilim Group (Kotlas PPM) |
Heat-power engineering
|
| 2006 |
Control System for Boiler House |
CJSC "Petrozavodskmash" |
Heat-power engineering
|
| 2006 |
Monitoring and Control System for hot-water boiler unit No.1 |
Petrozavodsk Branch, JSC PKS "Teploviye Sety" - Heat Supply Network |
Heat-power engineering
|
| 2006 |
Monitoring and Control System for boiler unit No.5 (modernization of the control system for new technological process with coal firing and mazut boiler kindling) |
Petrozavodsk Branch, JSC PKS "Teploviye Sety" - Heat Supply Network |
Heat-power engineering
|
| 2006 |
Monitoring and Control System for boiler unit |
JSC Komitex |
|
| 2006 |
Monitoring and Control System for boiler units No.3,4 |
Power Plant of the Neman PPM |
Heat-power engineering
|
| 2005 |
Technological Control System for hydrogenerator, unit ¹7 |
Krasnoyarsk HPP |
Hydropower engineering
|
| 2005 |
Control and secongary control wiring cabinets hydrogenerators unit ¹1 and ¹2 |
Balimela HPP |
Hydropower engineering
|
| 2005 |
Control System for wastewater treatment facilities (block 115) |
Landfill "Krasny Bor" |
Other industries
|
| 2005 |
Expansion of Automated operative-dispatch control system for processes of power supply, biological treatment of sewage water, modernization of cardboard pulping scheduling, communication bus modernization, at alias. |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2005 |
Control System for concrete mixing unit |
Syzran Plant of concrate goods |
Concrete and cement production
|
| 2005 |
Expansion of Automated operative-dispatch control system for processes of power supply, biological treatment of sewage water, modernization of cardboard pulping scheduling, at alias. |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2005 |
Control System for loading comlex of Yakovlevsky mine |
Metal Group Ltd. |
Metallurgy industry
|
| 2005 |
3 cabinets for turbocompressor (ÒÊ-10 ÏÂÑ-2) Control System |
Nizhniy Tagil Iron and Steel Works, JSC NTMK |
Metallurgy industry
|
| 2005 |
Monitoring and Control System for boiler unit |
JSC Severstal |
Heat-power engineering
|
| 2005 |
Monitoring and Control System for boiler units No.1,2 |
Power Plant of the Neman PPM |
Heat-power engineering
|
| 2005 |
Monitoring and Control System for boiler unit |
JSC Komitex |
Heat-power engineering
|
| 2005 |
Monitoring and Control System for boiler unit No.14 |
Thermal Power Station of the Arkhangelsk PPM |
Heat-power engineering
|
| 2005 |
Monitoring and Control System for boiler unit No.11 |
Power Plant of the Koryazhma Branch of Ilim Group (Kotlas PPM) |
Heat-power engineering
|
| 2005 |
Monitoring and Control System for 2 boiler units of central Boiler House |
Petrozavodsk Branch, JSC PKS "Teploviye Sety" - Heat Supply Network |
Heat-power engineering
|
| 2005 |
Monitoring and Control System for boiler unit |
Avangard Plant |
Heat-power engineering
|
| 2004-2007 |
Control System for boiler department (4 boiler units) |
Power Plant of the Neman PPM |
Multipurpose projects
|
| 2004 |
Control system for ventilation |
Se San 3 HPP |
Hydropower engineering
|
| 2004 |
Control System for hydroelectric units ¹7, ¹8 |
Balimela HPP |
Hydropower engineering
|
| 2004 |
Control System for tea packaging line |
Unilever |
Other industries
|
| 2004 |
Automated dispatch control system for communication centre |
Primorskaya and Dachnaya Heating Mains |
Heat-power engineering
|
| 2004 |
Expansion of Automated operative-dispatch control system for energy department and Automated operative-dispatch control system for cellulose production |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2004 |
Cement level Control System |
Novolipetsk Steel (JSC NLMK) |
Concrete and cement production
|
| 2004 |
Expansion of Automated operative-dispatch control system for energy department and Automated operative-dispatch control system for cellulose production |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2004 |
Technological Control System for turbogenerator ¹2 ÒÂÂ-1000-2ÒÇ |
Kudankulam NPP |
Nuclear power industry
|
| 2004 |
Monitoring and Control System for boiler unit No.4 |
CJSC International Paper, Svetogorsk Mill, Power Plant-3 |
Heat-power engineering
|
| 2003-2010 |
Control System for boiler department (9 boiler units) |
Power Plant of the Koryazhma Branch of Ilim Group (Kotlas PPM) |
Multipurpose projects
|
| 2003 |
Control system cabinets for auxiliary equpment |
Zeyskaya HPP, RusHydro JSC |
Hydropower engineering
|
| 2003 |
Technological Control System for hydrogenerator, unit ¹8 |
Krasnoyarsk HPP |
Hydropower engineering
|
| 2003 |
Control System for line of shooting targets manufacturing |
Novolipetsk Steel (JSC NLMK) |
Metallurgy industry
|
| 2003 |
Modernization of Automated operative-dispatch control system for fiberboard production |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2003 |
Modernization of Automated operative-dispatch control system for raw wood production |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2003 |
Automated operative-dispatch control system for bleached sulphate cellulose production |
Power Plant of the Koryazhma Branch of Ilim Group (Kotlas PPM) |
Heat-power engineering
|
| 2003 |
Control System for ceramic bricks production line |
Norsky Pottery CJSC |
Concrete and cement production
|
| 2003 |
Modernization of Automated operative-dispatch control system for fiberboard production |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2003 |
Modernization of Automated operative-dispatch control system for raw wood production |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2003 |
Automated operative-dispatch control system for bleached sulphate cellulose production |
Power Plant of the Koryazhma Branch of Ilim Group (Kotlas PPM) |
Pulp and paper industry
|
| 2003 |
Technological Control System for turbogenerator ÒÂÂ-1000-2Ó3, unit ¹2 |
Tyanvan NPP |
Nuclear power industry
|
| 2003 |
Technological Control System for turbogenerator ÒÂÂ-1000-Ò3 |
Kudankulam NPP |
Nuclear power industry
|
| 2003 |
System fo dataware and accident registration for emergency power supply systems, units ¹1, ¹2 |
Kola NPP |
Nuclear power industry
|
| 2003 |
MES System for Power Department of the PPM |
Svetogorsk JSC |
Multipurpose projects
|
| 2002-2007 |
MES System for Pulp and Paper Mill |
Arkhangelsk PPM |
Multipurpose projects
|
| 2002 |
Technological Control Systems for hydrogenerator type ÑÂ 904/235-36 ÒÄ4 |
Kapanda HPP |
Hydropower engineering
|
| 2002 |
Technological Control Systems for hydrogenerators, unit ¹5,6 |
Krasnoyarsk HPP |
Hydropower engineering
|
| 2002 |
Technological automation system for hydroelectric units No.5-No.6 (2 x 500 MW) |
Krasnoyarsk HPP |
Hydropower engineering
|
| 2002 |
Alarms and warning system for hydroelectric units No.5-No.6 (2 x 500 MW) |
Krasnoyarsk HPP |
Hydropower engineering
|
| 2002 |
Alarms and warning system for hydroelectric unit and electric power supply cabinet of outdoor switchgear 220 |
Krasnoyarsk HPP |
Hydropower engineering
|
| 2002 |
Modernization of Control System for packaging machine |
VTO "Energoservice" CJSC |
Other industries
|
| 2002 |
Control System for precooling unit AGNKS ¹8 |
Petrodvorets (St.Petersburg) |
Other industries
|
| 2002 |
Modernization of Automated operative-dispatch control system for paper and cardboard production |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2002 |
Control System for three concrete preparing plant |
Chudovo Concrete Sleeper Plant |
Concrete and cement production
|
| 2002 |
Modernization of Control System for for fiberboard production (heat-treatment cell) |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2002 |
Modernization of Control System for for fiberboard production (heat-treatment cell) |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2002 |
Modernization of Automated operative-dispatch control system for paper and cardboard production |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2002 |
Control System for compressor station ¹1 (4 compressors type 4Ì10-100/8 and 5 dry air installations) |
CJSC International Paper, Svetogorsk Mill |
Pulp and paper industry
|
| 2002 |
Conrol System for limestone calcining furnace |
Metallurgical Plant Petrostal CJSC |
Metallurgy industry
|
| 2002 |
Control System for three heat recovery boilers type ÏÒ-12 Ê-30/1,6-100 |
Ashinskiy metallurgical works JCS |
Metallurgy industry
|
| 2002 |
Control System for burden loading and air heating in blast furnace No.1 |
JSC Severstal |
Metallurgy industry
|
| 2002 |
Technological Control Systems for four turbogenerators ÒÂÂ-220 |
Kola NPP |
Nuclear power industry
|
| 2001-2005 |
Control System for boiler department (6 boiler units) |
Thermal Power Station of the Arkhangelsk PPM |
Multipurpose projects
|
| 2001 |
Control System for leaf bridge |
Saint-Petersburg Authorities, Alexander Nevsky Bridge |
Other industries
|
| 2001 |
Modernization of Control System for shrink-wrapping line |
Severnoe Siyanie CJSC |
Other industries
|
| 2001 |
Defect monitoring system "Wave-5-Oskol" |
OEMK (Oskol Electrometallurgy Combine) CJSC |
Other industries
|
| 2001 |
Technological Control System for turbogenerator ÒÂÂ-1000-2Ó3 |
Tyanvan NPP |
Nuclear power industry
|
| 2000 |
Control System for hydroelectric units No.1-No.2 |
Tolmachevskaya HPP |
Hydropower engineering
|
| 2000 |
Technological Control System for hydrogenerator, unit ¹1 |
|
Hydropower engineering
|
| 2000 |
Generator excitation control system for hydroelectric unit No.1 (500 MW) |
Krasnoyarsk HPP |
Hydropower engineering
|
| 2000 |
Alarms and warning system for hydroelectric unit No.1 (500 MW) |
Krasnoyarsk HPP |
Hydropower engineering
|
| 2000 |
Technological automation system for hydroelectric unit No.1 (500 MW) |
Krasnoyarsk HPP |
Hydropower engineering
|
| 2000 |
Defect monitoring system "Wave-6-Donetsk" |
Donetsk steel CJSC |
Metallurgy industry
|
| 2000 |
Modernization of Control System for granular product line |
Severnoe Siyanie CJSC |
Other industries
|
| 2000 |
Control System for fiberboard production line |
Arkhangelsk PPM |
Pulp and paper industry
|
| 2000 |
Technological Control System for turbogenerators ÒÀÏ-12-2ÓÇ |
Bilibino NPP |
Nuclear power industry
|
| 1999 |
Control System for hydroelectric unit No.4 |
Krivoporozhskaya HPP, TGC-1 JSC |
Hydropower engineering
|
| 1999 |
Control system for roll-formed section production line |
TEKS Company |
Other industries
|
| 1999 |
Control system for process line of putting colour drawing onto package film |
Samson JSC |
Other industries
|
| 1999 |
MES-System (Automated operative-dispatch control system), 1st stage of realization |
Arkhangelsk PPM |
Pulp and paper industry
|
| 1998 |
Control System for hydroelectric unit No.3 |
Krivoporozhskaya HPP, TGC-1 JSC |
Hydropower engineering
|
| 1998 |
Technological Control Systems for hydrogenerators unit ¹1 and ¹2 |
Sheksninskaya HPP |
Hydropower engineering
|
| 1998 |
Generator excitation control system for hydroelectric unit No.4 (500 MW) |
|
Hydropower engineering
|
| 1998 |
Technological Control System for hydrogenerator, unit ¹4 |
Krasnoyarsk HPP |
Hydropower engineering
|
| 1998 |
Control System for industrial combined extract and input ventilation |
|
Pulp and paper industry
|
| 1998 |
Power resources accounting system "Energy" |
CJSC International Paper, Svetogorsk Mill |
Pulp and paper industry
|
| 1998 |
Control System for open-hearth shop compressor station |
Metallurgical Plant Petrostal CJSC |
Metallurgy industry
|
| 1997 |
Control System for hydroelectric units No.1-No.2 |
Krivoporozhskaya HPP, TGC-1 JSC |
Hydropower engineering
|
| 1997 |
Technological Control Systems for hydrogenerators unit ¹3,4 |
Sheksninskaya HPP |
Hydropower engineering
|
| 1997 |
Technological Control System for hydrogenerator, unit ¹3 |
Krasnoyarsk HPP |
Hydropower engineering
|
| 1997 |
Control system for floor-by-floor escalator |
Escalator Spb CJSC |
Other industries
|
| 1997 |
Control System for industrial combined extract and input ventilation |
Power Plant of the Koryazhma Branch of Ilim Group (Kotlas PPM) |
Pulp and paper industry
|
| 1996 |
Technological Control System for hydrogenerator, unit ¹2 |
Krasnoyarsk HPP |
Hydropower engineering
|
| 1996 |
Control system for refuelling station |
Doza Service CJSC |
Other industries
|
| 1996 |
Control System for board grade line |
Bratsk Branch of Ilim Group (Bratsk Pulp and Containerboard Mill) |
Pulp and paper industry
|
| 1995 |
Alarms and warning system for hydroelectric unit |
Novosibirsk HPP |
Hydropower engineering
|
| 1995 |
Control System for hydroelectric unit |
Novosibirsk HPP |
Hydropower engineering
|
| 1994 |
Control system for diamond ore grinding mill |
Katoka |
Other industries
|
| 1994 |
Modernization of control system for extrusion line of FT-312/ 14-18 type |
Sevkabel JSC |
Other industries
|